Pre-Sales Engineering
The work that happens BEFORE implementation. Architecture, sizing, migration strategy, product sourcing. Implementation is dramatically smoother when design-in has been done first.
Our implementation service guides organizations through the complete adoption process, handling logistics from product delivery through successful deployment and team readiness. Treating implementation as more than just technical setup - encompassing change management, education, and coordinated rollout - is how new solutions actually land in production without disruption.
Most failed deployments fail in stages one or two. By the time technical install begins, the outcome is largely already decided. We treat planning and training as the bulk of the work, not the afterthought.
Schedule the deployment timeline. Coordinate physical product delivery (hardware, licenses, accessories). Plan the training and testing phases. Identify stakeholders and sign-off authorities. Build the rollback plan before anything moves.
Planned, not improvisedAdministrator training so your IT team can run the solution after we’re gone. End-user training where relevant. Testing-and-training environments set up alongside production so people can rehearse the new flow.
Ready before cutoverProduct installation and configuration. Sign-off period for stakeholders to validate before production cutover. Full deployment execution. Post-deploy tuning to settle out the noise that comes with any new platform.
Production-ready cutoverA successful implementation requires that stakeholders understand the solution, receive appropriate training at all levels, and are prepared before sign-off. We treat each of those as a deliverable, not an afterthought.
Hardware shipped to the right address, licenses pre-registered, accessories accounted for. We catch the things that go missing on most deployments: power cables, mounting brackets, fibre transceivers.
Your IT team needs to operate the solution long after we’re gone. We train administrators on the daily, weekly, and monthly tasks they’ll own - not just “here’s the console, good luck.”
Replacing existing firewall, endpoint, or email gateway? We translate rules, NAT, VPNs, and policies from the old platform, validate in parallel, and run a planned cutover with rollback ready.
Where appropriate, we set up a parallel environment for admins and end-users to rehearse against. The change is less scary if your team has seen it once before in a non-production context.
A formal sign-off period before production go-live so stakeholders confirm the solution meets requirements. Catches the “wait, we needed it to do X” moments before they become incidents.
New security platforms generate noise out of the gate. We stay engaged after go-live to tune detections, refine policy, and quiet the alerts that turn out not to matter in your environment.
If you’re bringing a new security platform into production - or replacing one that’s being retired - structured implementation from an engineering firm with certified staff dramatically reduces the chance of a painful go-live.
You’re bringing Sophos into your environment for the first time. We handle the deployment end-to-end so your team learns the platform in production, not by trial and error.
Production from day oneEnd-of-life appliance, vendor change, M&A consolidation. The migration is mostly a planning problem and a parallel-run problem; we handle both.
Reversible cutoverDistributed offices, branches, clinics, or retail locations. We design the rollout sequence so each site goes live without affecting the rest, with consistent configuration enforced by templating.
Consistent at every siteDesign-in happens before implementation; ongoing operation happens after. These are the services that bracket a deployment engagement.
The work that happens BEFORE implementation. Architecture, sizing, migration strategy, product sourcing. Implementation is dramatically smoother when design-in has been done first.

The work that happens AFTER implementation, ongoing. MDR runs the platform 24/7 so the deployment you just commissioned actually catches things at 2am on a Sunday.

For when something goes wrong despite the best deployment. Emergency hands-on response from senior incident responders. Worth having on retainer once the platform is live.
Talk to our team about your deployment timeline, the existing environment, and what success looks like for the project. Or request a quote that includes the implementation hours alongside the Sophos licensing.